Jamshedpur-Odisha Road Link Snapped Due To Diversion

Jamshedpur 1st Oct 2021: Incessant rains for the last 24 hours have closed the road connectivity between Jamshedpur and Odisha.

Last year, a culvert was constructed near Hata on the Highway 220 road connecting Jamshedpur-Odisha.

The passage of vehicles was going smoothly by diversion near the culvert, but the diversion got washed away due to continuous rain after the Gulab storm.

Dozens of heavy vehicles were stranded on both sides of the road as the Jamshedpur-Odisha main road was closed due to diversion.

According to the information, the entire Haldipokhar has been transformed into an island. Local people said that the construction of the culvert was going on at a very slow pace.

Retired teacher Shankar Chandra Gop said that people are facing a lot of trouble due to the diversion of substandard quality.

Despite several complaints to the contractor, the work was going on at tortoise speed. As a result, the diversion has flowed.

Please follow and like us: